In 2011, Airbus redesigned the A350-1000 with higher weights and a more powerful engine variant to provide more range for trans-Pacific operations. This boosted its appeal to Cathay Pacific and Singapore Airlines, who were committed to purchase 20 Boeing 777-9s, and to United Airlines, which was considering Boeing 777-300ERs to replace its 747-400s. Emirates was disappointed with the changes and cancelled its order for 50 A350-900s and 20 A350-1000s, instead of changing the whole order to the larger variant. Assembly of the first fuselage major components started in September 2015. In February 2016, final assembly started at the A350 Final Assembly Line in Toulouse. Three flight test aircraft were planned, with entry into service scheduled for mid-2017. The first aircraft completed its body join on 15 April 2016. Its maiden flight took place on 24 November 2016. In 2011, Airbus redesigned the A350-1000 with higher weights and a more powerful engine variant to provide more range for trans-Pacific operations. This boosted its appeal to Cathay Pacific and Singapore Airlines, who were committed to purchase 20 Boeing 777-9s, and to United Airlines, which was considering Boeing 777-300ERs to replace its 747-400s. Emirates was disappointed with the changes and cancelled its order for 50 A350-900s and 20 A350-1000s, instead of changing the whole order to the larger variant. Assembly of the first fuselage major components started in September 2015. In February 2016, final assembly started at the A350 Final Assembly Line in Toulouse. Three flight test aircraft were planned, with entry into service scheduled for mid-2017. The first aircraft completed its body join on 15 April 2016. Its maiden flight took place on 24 November 2016.