facthunter Posted September 8, 2021 Posted September 8, 2021 The couple getting married need advice. Their brains are probably in short circuit mode They say there's a chemical that reduces the female Libido and it's in wedding cake. Nev 5
Marty_d Posted September 8, 2021 Posted September 8, 2021 13 minutes ago, facthunter said: The couple getting married need advice. Their brains are probably in short circuit mode They say there's a chemical that reduces the female Libido and it's in wedding cake. Nev Total thread drift - but what amuses me about catholic weddings is the need to get advice from a priest first. Naturally the best person to give advice on married life is someone who will stay single their whole life and is (supposedly) celibate... 1 1 1
facthunter Posted September 8, 2021 Posted September 8, 2021 I think that's only to push the need to have the children in the catholic way. Churches generally have no real idea about sex. It's only a trick to get you to procreate and it's not for fun.. Priests can't marry or the church would have to support the children and that'd divert funds. They are inflexible with this unlike Spacies cement boat . There .. That's back to topic. Nev 1
Yenn Posted September 9, 2021 Posted September 9, 2021 All concrete can bend and reinforced concrete is load carrying. It does not need to be pre stressed or post tensioned. those processes only increase the load carrying ability. As far as bending goes I have watched an 80' chimney in very high wind bend and twist. The way the reinforcing is placed controls the way concrete will bend. 1 2 1
rgmwa Posted September 9, 2021 Posted September 9, 2021 A typical light industrial slab is 125-150mm thick and reinforced with a single layer of SL72, SL82 or perhaps SL92 mesh laid about 40mm down from the top surface. The edges should be thickened to about 300 mm deep with a layer of L8 or L11 trench mesh in the bottom. That should be fine for a something like a Kingair. The more important thing is what is under the slab and how well it's compacted. That's where you need to get some local engineering advice on how to prepare the subgrade and what sort of slab you need. I've seen loaded concrete trucks drive on 100mm thick shopping centre slabs that were just a week old with no issues. I've also seen 300mm thick slabs break up after a short time in service. 3 2
facthunter Posted September 10, 2021 Posted September 10, 2021 No water or tree roots underneath Don't just dismiss the hotmix. Concrete is a lot of money. If you use concrete do it in sections to reduce cracking. 15 meters of slab will crack Eventually. There's furious agreement on the need for a stable and compacted substrate. If it's clay or some other crap there you might have to remove some and mix stuff into it and compact it the same as you must do with a road. Nev 1 1
RFguy Posted September 10, 2021 Author Posted September 10, 2021 It has a workshop, and also hangar area. It might get done piecemeal anyway Nev , depends what I can afford in what stages...
facthunter Posted September 10, 2021 Posted September 10, 2021 If you are going to pour it right to the corrugated Iron be sure to use stakes to stop the sheets moving out under the pressure. Looks really crap if that happens. Bag it so you don't slip on the surface, Plastic sheet under to stop water and salt rising. Do you need a section to wash parts? You can put a slope there and a drain pipe. Nev 1
Yenn Posted September 10, 2021 Posted September 10, 2021 pour it in square or nearly square sections, with plain steel bars running from the poured slab into the next section. that stops any uneven subsidence. 6m square is quite large enough for a pour. One of the good things is that you use the already poured slab as formwork for the adjacent slabs. I am about twenty years out of date with estimating for this kind of job, but as someone said hotmix is a good alternative to concrete. It won't crack as concrete can if not treated correctly and also is reasonably easy to repair. Good road base can also provide a good floor, especially if you overlay it with old carpet as I have done in my hangar. 1
RFguy Posted September 10, 2021 Author Posted September 10, 2021 6 sq M, so for a 150mm minimum slab, 5.4cuM . OK.
Thruster88 Posted September 10, 2021 Posted September 10, 2021 I am pretty sure they did Fred's new hangar in just 3 sections.
RFguy Posted September 10, 2021 Author Posted September 10, 2021 Iron Ore prices the past 12 months have sent the steel for hangars cost skyrocketing. But its back on its way down Futures market price for Jan, feb March is back down at $120. 1
Bruce Tuncks Posted September 10, 2021 Posted September 10, 2021 Yenn, you are an engineer of my vintage. We learned how to calculate buildings with maths. Buggered if I know what they teach these days. Computers are so much better that I was. At Adelaide, they sacked the maths dept from contributing to engineering stuff. The last time I tried to help a son-in-law, it was sooo much easier to do a google thing than to do it my old way, but I did both just for old times sake. And yes, to stay on topic, we sure did reinforced concrete and soil mechanics. There has been some good advice given out on this topic.
Yenn Posted September 11, 2021 Posted September 11, 2021 I suggested 6m square, not 6sq. metres. A big difference. The actual size would depend upon the total area to be poured. For example my 12 by 9 hangar would be poured in 4 by 3 sections. I don't know what they tought in the nineties, but some engineers had no idea of what was what and others where good. I even came across a bloke with a masters degree from I think it was Stalingrad, who didn't even know which side of a retaining wall was in tension and which was in compression. 1 1
RFguy Posted September 11, 2021 Author Posted September 11, 2021 yeah I meant 6x6 ....at 6x6x0.15 = 5.4. hangar is 19mx35m so would probable do partials 2 lots of 9.5 or 3 lots of 6.3333333 depends what is required to get occupancy cert. anyway, hangar will go up.
APenNameAndThatA Posted September 11, 2021 Posted September 11, 2021 Hopefully, 35 m wide and 19 m deep. Either way, you will fit a lot in there. That will be great.
RFguy Posted September 11, 2021 Author Posted September 11, 2021 actually 19m wide, 35 deep. the blocks of 25x50m. there must be a 15m setback from the taxiway to the front of the hangar. Unfortunately, the council , in my opinion, has some requirements that inflate the cost, such as pretty facades on the front of the building, a califormia bungalow roof set. etc etc. No square boxes allowed... Its a good example why no new hangars have been built when they have to meet some costly and non essential requirements. 1
facthunter Posted September 12, 2021 Posted September 12, 2021 Don't make it so you have to get a lot of planes out to get the one from the back. I never like others moving my plane or hangar rashing it. Nev 3
RFguy Posted September 12, 2021 Author Posted September 12, 2021 And that is what will limit what I can put in the hangar.. although there is a 5.5m ceiling (well 5.5m to the bottom of the trusses) so one could stack LSAs with a forklift and bays. the idea is I have two planes in the back, and I can fit a customer's plane in front. Yes, wide and shallow is far more multi airplane friendly. or the T style (front / rear alternate opening like at CBR airport hangars)
facthunter Posted September 12, 2021 Posted September 12, 2021 I'd forget the forklift bit. Yes a long front with doors which open on most of it works ok.(slide). Make sure the wind calculations are for high winds because these days you could get a twister anywhere. It's hard to brace a wide door structure if the opening goes right to the wall. Nev
facthunter Posted September 12, 2021 Posted September 12, 2021 There's multi panel doors that behave better in winds I don't know how wide those things can be without having problems..Nev
RFguy Posted September 12, 2021 Author Posted September 12, 2021 Well the biggest issue I have with multi panel is the seals. I need dust tight as much as possible. That actually might be easier by positive pressurizing the building. Solar derived power is cheap.
facthunter Posted September 12, 2021 Posted September 12, 2021 Any type of door has sealing problems especially of the dimensions a hangar needs. The multi panels has plenty of hinges and is easily sealed at those points. The lower face is like a roller door. Descends vertically at closure (easy enough but must be swept clean. and close fully.) Up the top you might have to fit a flexible rubber gap filler/seal. Nev.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now